Condo Roof Reserves & SIRS Inspections in Florida (SB 4-D)
- 119 SWFL buildings re-roofed
- GAF Certified
- Licensed & Insured
- Xactimate Documentation
Proven On The Ground
Communities We Have Roofed
Royal Arms
Flat Roofing- Scope
- 46 buildings
46 buildings, whole-association re-roof and painting. Flat roofs + shingle mansards + standing seam mansards.
View the case studyTripoli Boulevard Community
Tile- Scope
- 50 buildings
- Roofing
- 2,500 squares
50 buildings, 2,500 squares of tile-to-tile replacement in Punta Gorda.
View the case studyCoach Homes 2
Tile- Scope
- 22 buildings
- Roofing
- 2,057 squares
The largest phase of Coach Homes — 22 buildings of tile roofing at the Bay Association.
View the case studyLinkside Condominiums
Shingle- Scope
- 1 building
- Roofing
- 800 squares
Re-roof and painting on a 3-story North Port condominium: about 800 squares of shingle.
View the case studyThe Compliance Picture
What SWFL Associations Face
SB 4-D and the related condominium-safety statutes changed the rules for every three-story-plus condominium in Florida. The parts that matter for a roof line item:
- Full reserve funding is mandatory. Boards can no longer vote to waive or partially fund reserves for the roof and other structural components once a SIRS is in place.
- The SIRS is required. A Structural Integrity Reserve Study must estimate the remaining useful life and replacement cost of the roof (among other components) so the reserve is funded to reality, not to a guess.
- The milestone inspection has a clock. Condo and co-op buildings three or more habitable stories tall need a milestone inspection by December 31 of the year the building turns 30, then every 10 years (s. 553.899, F.S.). The local building official may require it at 25 years based on local conditions such as proximity to salt water — and a roof at or near the end of its service life is one of the first things that inspection surfaces.
- The 25% rule reshapes scope. When more than 25% of a roof section is repaired or replaced within 12 months, Florida generally requires that section be brought to current code, unless it was built, repaired or replaced under the 2007 Florida Building Code or later, in which case only the repaired or replaced portion has to (s. 553.844(5), F.S.) — which can change the assembly, and the number, that belongs in the reserve study.
Apart from that local 25-year option, none of this depends on where in Florida your association sits — it is statewide law. What we add is the field data underneath it: an on-roof assessment, a defensible remaining-life estimate, and a replacement-cost figure grounded in what re-roofs actually cost right now, so your reserve study and your milestone inspection agree with each other instead of surprising the board later.
Funding The Reserve
Maintenance That Funds Your Next Roof.
Armor Shield gives your board documented annual maintenance plus a Roof Savings Account that credits your fees toward future replacement — turning a recurring line item into a growing reserve while SB 4-D raises the pressure to fully fund one.
- Documented Annual Inspections
- Roof Savings Account Credit
- Priority Storm Response
The Record
Communities On The Record
We re-roofed all 46 buildings at Royal Arms. See the case study →
We re-roofed all 50 buildings at Tripoli Boulevard Community — 2,500 squares of tile. See the case study →
We re-roofed all 22 buildings at Coach Homes 2 — 2,057 squares of tile. See the case study →
We re-roofed the 3-story building at Linkside Condominiums — 800 squares of shingle. See the case study →
Board Questions
Questions Boards Ask Us
Does a Roof Wars condition report satisfy the SIRS requirement by itself?
Our reserves were waived for years. How do we fund a re-roof now?
How does the milestone inspection interact with the roof?
Does full-reserve funding apply to our HOA, or only condominiums?
Board & Property-Manager Intake
Request a Proposal for Your Association
Prefer to talk it through first? Call (239) 766-6613.
Give Your Board a Roof Partner That Shows Up.
Multi-building coordination, board-ready documentation, and storm-day priority.