
Reserve & SB 4-D Division · Statewide Florida
Condo Roof Reserves & SIRS Inspections in Florida (SB 4-D)
- 129 SWFL buildings re-roofed
- GAF Certified
- Licensed & Insured
- Xactimate Documentation
Proven On The Ground
Communities We Have Roofed
Royal Arms
Flat Roofing- Scope
- 56 buildings
56 buildings, whole-association re-roof. Flat roofs + shingle mansards + standing seam mansards.
View the case studyTripoli Boulevard Community
Tile- Scope
- 50 buildings
- Roofing
- 2,500 squares
50 buildings, 2,500 squares of tile-to-tile replacement in Punta Gorda.
View the case studyCoach Homes 2
Tile- Scope
- 22 buildings
- Roofing
- 2,057 squares
The largest phase of Coach Homes — 22 buildings of tile roofing at the Bay Association.
View the case studyLingside Condominiums
Shingle- Scope
- 1 building
- Roofing
- 800 squares
800 squares of shingle replacement on a 3-story North Port condominium.
View the case studyThe Compliance Picture
What SWFL Associations Face
SB 4-D and the related condominium-safety statutes changed the rules for every three-story-plus condominium in Florida. The parts that matter for a roof line item:
- Full reserve funding is mandatory. Boards can no longer vote to waive or partially fund reserves for the roof and other structural components once a SIRS is in place.
- The SIRS is required. A Structural Integrity Reserve Study must estimate the remaining useful life and replacement cost of the roof (among other components) so the reserve is funded to reality, not to a guess.
- The milestone inspection has a clock. The structural milestone-inspection trigger is 25 years for buildings within three miles of the coast and 30 years inland — and a roof at or near the end of its service life is one of the first things that inspection surfaces.
- The 25% rule reshapes scope. When more than 25% of a roof section is replaced, Florida requires that section be brought to current code — which can change the assembly, and the number, that belongs in the reserve study.
None of this depends on where in Florida your association sits — it is statewide law. What we add is the field data underneath it: an on-roof assessment, a defensible remaining-life estimate, and a replacement-cost figure grounded in what re-roofs actually cost right now, so your reserve study and your milestone inspection agree with each other instead of surprising the board later.
Funding The Reserve
Maintenance That Funds Your Next Roof.
Armor Shield gives your board documented annual maintenance plus a Roof Savings Account that credits your fees toward future replacement — turning a recurring line item into a growing reserve while SB 4-D raises the pressure to fully fund one.
- Documented Annual Inspections
- Roof Savings Account Credit
- Priority Storm Response
The Record
Communities On The Record
We re-roofed all 56 buildings at Royal Arms. See the case study →
We re-roofed all 50 buildings at Tripoli Boulevard Community — 2,500 squares of tile. See the case study →
We re-roofed all 22 buildings at Coach Homes 2 — 2,057 squares of tile. See the case study →
We re-roofed the 3-story building at Lingside Condominiums — 800 squares of shingle. See the case study →
Board Questions
Questions Boards Ask Us
Does a Roof Wars condition report satisfy the SIRS requirement by itself?
Our reserves were waived for years. How do we fund a re-roof now?
How does the milestone inspection interact with the roof?
Does full-reserve funding apply to our HOA, or only condominiums?
Board & Property-Manager Intake
Request a Proposal for Your Association
Prefer to talk it through first? Call (239) 766-6613.
Give Your Board a Roof Partner That Shows Up.
Multi-building coordination, board-ready documentation, and storm-day priority.
